EMIS Redesign Documentation

Manuals, User Guides, and other documents related to the redesign of EMIS.

  • SSID User Guide
    The SSID User Guide has been removed from this site. If a copy is needed, districts should contact their ITC.
  • SLF Agent Overview for eSIS and DASL (Draft)
    The SLF Agent Overview for eSIS and DASL has been removed from this site. If a copy is needed, districts should contact their ITC.
  • Performance Period Plan - Update 7/15/10, Version 2.4
    The Performance Period is a timeframe dedicated to determining acceptance of project deliverables.  This Plan outlines the current methodology being used to determine acceptance and the schedule for requested data submissions by Ohio’s districts in regards to the EMIS Redesign.
  • LEA Data Collector Checklist - Updated 12/14/09, Version 1.1
    The Data Collector User Checklist is used by EMIS reporting entities to aid in data collection in the redesigned EMIS.  
  • Data Collector User Guide
    The User Guide has been removed from this site. If a copy is needed, districts should contact their ITC.

EMIS Redesign Presentations

Last Modified: 6/27/2019 8:28:24 AM